(1) The proposer shall be obliged to conduct the proposed citizens’ initiative at local level within one month from the day of receiving the notification of its orderliness.
(2) If the proposed citizens’ initiative at local level is not conducted within the time frame referred to in paragraph (1) of this Article, the same shall not be as started.